Requirement: Mechanisms and Algorithms
Critical Path Analysis
Purpose:
BP-Modelling Processing: Critical Path Specification
The system must enable specifying the most critical paths in the BP. The different path included within a BP instantiation will have different level of difficulty wrt their comprehension. Both the automatic generation procedure, and the simulation process must be aware of such an aspect.
Scope:
The scope of the implementation targets evaluation of the critical path by means of the path analysis algorithm of the simulation component.
Target System:
ADOxx 1.3UL1
Functional Requirements Specification:
The system shall provide an algorithm which analysis every path of a process and display the expectatin values and critical paths.
Non-Functional Requirements Specification:
The system shall provide a trigger for the simulation algorithm and a GUI for the results.